How much water do data centers use?
Water figures as published for the projects in the Census. Of 101 tracked projects, 26 have a published water-use figure and 68 disclose something about water or cooling.
Data centers use water mainly for cooling. How much depends on the cooling design: evaporative systems consume water continuously, while closed-loop and air-cooled designs use far less on site but often more electricity. Much of the public argument is about numbers nobody has published, so this page shows only figures a developer, agency or filing has put on the record, and says so where there are none.
| Project | Water use | Water source | Cooling |
|---|---|---|---|
| Fermi America Project Matador Amarillo, Carson County, TX | 2,500,000 gal/day ↗ | City of Amarillo (municipal) ↗ | Not published |
| Stratos Project Box Elder County, UT | Not published | Privately owned water rights; pending application for 11 acre-feet per year for power generation after an earlier 1,900 acre-foot application was withdrawn following public objection ↗ | closed-loop ↗ |
| Comanche Circle Tolar, Hood County, TX | 150,000 gal/day ↗ | private groundwater wells; private wastewater treatment plant ↗ | closed-loop (company-stated) ↗ |
| Homer City Energy Campus Homer City, Indiana County, PA | Not published | Two Lick Creek, supplied by the Central Indiana County Water Authority ↗ | Not published |
| Project Camellia Rincon, Effingham County, GA | 30,000 gal/day ↗ | Effingham County Water Treatment Plant, without line extensions ↗ | closed-loop ↗ |
| Project Tembo Cheyenne, Laramie County, WY | Not published | deep wells beneath the local aquifer ↗ | closed-loop, air-cooled ↗ |
| Project Jupiter Santa Teresa, Doña Ana County, NM | 20,000 gal/day ↗ | Oracle says no potable water for cooling; a well drilled for the project has pumped about 103 million gallons since April 2026 ↗ | closed-loop ↗ |
| Quantum Frederick Adamstown, Frederick County, MD | 1,300,000 gal ↗ | Not published | Not published |
| Project Tamarack West Columbia, Mason County, WV | Not published | Not published | closed-loop ↗ |
| IREN Sweetwater data center campus Sweetwater, Fisher County, TX | Not published | Not published | air and liquid cooling ↗ |
| Project Horizon Fort Stockton, Pecos County, TX | Not published | Non-potable groundwater within existing permitted allocations ↗ | Poolside's 2025 announcement described air cooling; its CEO later described closed-loop liquid cooling using non-potable groundwater ↗ |
| Project Phoenix Shippingport, Beaver County, PA | Not published | Not published | closed-loop system recycling deionized water; zero water for operational cooling (company-stated) ↗ |
| Joliet Technology Center Joliet, Will County, IL | 150,000 gal/day ↗ | Aquifer (city plans shift to Lake Michigan water in 2030) ↗ | closed-loop ↗ |
| Vantage Frontier Campus Albany, Shackelford County, TX | Not published | Not published | air and liquid cooling; closed-loop chiller design ↗ |
| Saline Township Stargate Data Center Saline Township, Washtenaw County, MI | 20,000 gal/day ↗ | On-site well with its own waste treatment system ↗ | Closed-loop, air-cooled; consent judgment bans water-intensive evaporative cooling ↗ |
| Port Washington (Lighthouse) Data Center Campus Port Washington, Ozaukee County, WI | 10,000 gal/day ↗ | Not published | Air-cooled and liquid-to-liquid systems with closed-loop chilled water (developer says WUE near zero) ↗ |
| Fort Meade Hyperscale Data Center Fort Meade, Polk County, FL | 50,000 gal/day ↗ | Upper Floridan Aquifer (city water) ↗ | closed-loop ↗ |
| Project Marvel Bessemer, Jefferson County, AL | 2,000,000 gal/day ↗ | Warrior River Water Authority (with Jefferson County Sewer), per developer; discussions ongoing as of Nov. 2025 ↗ | closed-loop ↗ |
| Stargate Abilene Abilene, Taylor County, TX | Not published | Not published | closed-loop liquid ↗ |
| Stargate Milam County Burlington, Milam County, TX | Not published | Company says the site is designed to minimize water use (no figures given) ↗ | Closed-loop water cooling ↗ |
| QTS Cedar Rapids Data Center Campus Cedar Rapids, Linn County, IA | Not published | Not published | closed-loop, water-free cooling ↗ |
| Goodnight Campus Claude, Armstrong County, TX | Not published | Aquifer (groundwater), with recirculating cooling ↗ | closed-loop / recirculating ↗ |
| Global AI Data Center Windsor, Weld County, CO | Not published | Initial fill of 65,000 gallons with about 6,500 gallons annual top-off ↗ | closed-loop (permit condition) ↗ |
| Meta El Paso Data Center El Paso, El Paso County, TX | 2,500,000 gal/day ↗ | Not published | Not published |
| Meta Lebanon Data Center Lebanon, Boone County, IN | 3,000,000 gal/day ↗ | Eagle Creek Reservoir and other sources piped to LEAP district, per News and Tribune ↗ | closed-loop, direct-to-chip liquid cooling with dry coolers ↗ |
| Polaris Forge 1 Ellendale, Dickey County, ND | Not published | Not published | closed-loop recirculating water; company calls it waterless cooling ↗ |
| Project Boulder Walterboro, Colleton County, SC | Not published | About 500,000 gallons to fill closed-loop system ↗ | closed-loop non-evaporative ↗ |
| Project Cannoli Van Buren Township, Wayne County, MI | 3,600,000 gal/day ↗ | Great Lakes Water Authority (GLWA) system via a connection to the 42-inch GLWA main at Tyler and Haggerty roads ↗ | Not published |
| Project Sail Newnan, Coweta County, GA | 300,000 gal/day ↗ 6,000,000 gal/day ↗ | Not published | Not published |
| Lake Mariner Somerset, Niagara County, NY | Not published | Not published | closed-loop water cooling ↗ |
| CyrusOne Sangamon County Data Center Waverly, Sangamon County, IL | 2,800 gal/day ↗ | Apple Creek Water Cooperative ↗ | air-cooled, closed-loop ↗ |
| Amazon Web Services Louisa County campuses Louisa, Louisa County, VA | Not published | Northeast Creek Reservoir (raw water) ↗ | water-cooled using untreated raw water ↗ |
| CRG Festus Data Center Festus, Jefferson County, MO | Not published | Not published | closed-loop (per CRG) ↗ |
| Compass Statesville Statesville, Iredell County, NC | Not published | Not published | air-cooled ↗ closed-loop hybrid cooling (developer-stated) ↗ |
| Tooele Valley data center (Burmester Road / I-80) Tooele County, UT | Not published | Groundwater treated by reverse osmosis; brine discharged toward Great Salt Lake (up to 0.26 MGD at full build-out, ~29,000 gpd Phase I) ↗ | Not published |
| Hut 8 River Bend Campus St. Francisville, West Feliciana Parish, LA | Not published | Not published | closed-loop ↗ |
| Imperial Data Center Imperial, Imperial County, CA | 750,000 gal/day ↗ | Originally planned recycled water from nearby cities; developer now seeking Colorado River water from Imperial Irrigation District ↗ | Not published |
| CoreWeave Lancaster data center Lancaster, Lancaster County, PA | 20,000 gal/day ↗ | Not published | air cooling and a closed-loop water system ↗ |
| Google Botetourt County Data Center Campus Botetourt County, VA | 2,000,000 gal/day ↗ | Western Virginia Water Authority (new infrastructure at Google's expense) ↗ | air-cooling for the first of three buildings ↗ |
| Nebius Vineland Data Center Vineland, Cumberland County, NJ | Not published | Nebius says 1 million-gallon initial fill and about 7 Olympic pools a year; press reports about 20 million gallons a year ↗ | closed-loop ↗ |
| New Hill Digital Campus Apex, Wake County, NC | Not published | recirculating nonpotable water (developer-stated) ↗ | Not published |
| Project Blue Tucson, Pima County, AZ | 20,000 gal/day ↗ | Groundwater wells approved by ADWR ↗ | closed-loop air-cooled ↗ |
| Golden Valley Technology Hub Taft, Kern County, CA | Not published | Not published | closed-loop, non-evaporative ↗ |
| QTS Fayetteville data center campus Fayetteville, Fayette County, GA | 2,000 gal/day ↗ | Fayette County Water System (municipal) ↗ | closed-loop ↗ |
| Sabey Decatur Technology Park Indianapolis, Marion County, IN | Not published | Not published | closed-loop water-reduction system (developer-stated) ↗ |
| Perry Township Data Center Canton, Stark County, OH | Not published | municipal (City of Canton) ↗ | ambient air in cooler months; active cooling mainly in summer ↗ |
| Prime Phoenix Campus Avondale, AZ | Not published | Not published | closed-loop cooling engineered for zero process water use during operations ↗ |
| Utah Data Center Bluffdale, Utah County, UT | 1,700,000 gal/day ↗ 1,200,000 gal/day ↗ | municipal (City of Bluffdale water-delivery system) ↗ | Not published |
| Blueprint Taylor Data Center Taylor, Williamson County, TX | Not published | Not published | closed-loop ↗ |
| DC BLOX Nashville Data Center Nashville, Davidson County, TN | Not published | Not published | closed-loop water recirculation (per DC BLOX) ↗ |
| Amazon Web Services Madison County Mega Site campus Canton, Madison County, MS | Not published | Canton Municipal Utilities now; switching to treated municipal wastewater (Veolia facility) for cooling ↗ | Not published |
| Amazon Web Services Richmond County data center campus Hamlet, Richmond County, NC | Not published | Richmond County water system (municipal) ↗ | outside air most of the year, with water-based cooling in peak summer ↗ |
| Balico data center campus and gas plant Chatham, Pittsylvania County, VA | 2,000,000 gal/day ↗ | Not published | Not published |
| Compass Datacenters Red Oak second campus Red Oak, Ellis County, TX | Not published | Not city water for cooling (per city leaders) ↗ | closed-loop ↗ |
| Falls Township Innovation Campus Falls Township, Bucks County, PA | Not published | Not published | Water-based cooling less than 2% of the year ↗ |
| Google Morgan County Data Center Monrovia, Morgan County, IN | Not published | Not onsite groundwater (company-stated) ↗ | Not published |
| Google Palo data center campus Palo, Linn County, IA | 12,000,000 gal/day ↗ | Cedar River ↗ | Not published |
| Highlander SM One data center San Marcos, Hays County, TX | 70,000 gal/day ↗ | Local aquifers ↗ | Not published |
| Meta Cheyenne Data Center Cheyenne, Laramie County, WY | Not published | Not published | First phase closed-loop; second phase evaporative ↗ |
| Microsoft Fairwater Mount Pleasant, Racine County, WI | Not published | Racine water; the expansion's annual requirement is not to exceed 8.4 million gallons ↗ | closed-loop liquid cooling for over 90% of facility; outside air for the rest, with water only on the hottest days ↗ |
| Microsoft Fairwater Atlanta Fayetteville, Fayette County, GA | Not published | closed-loop; Microsoft says the initial fill equals what about 20 homes use in a year and operations consume almost zero water ↗ | closed-loop liquid (direct liquid cooling at rack level, ~140 kW per rack) ↗ |
| Microsoft Gaines Township data center Caledonia, Kent County, MI | Not published | Byron-Gaines Water System (municipal); Microsoft says it will not withdraw groundwater ↗ | Not published |
| Pennsylvania Digital 1 (PAX-1) Middlesex Township, Cumberland County, PA | 400,000 gal/day ↗ | Not published | Not published |
| Project Rainier (AWS New Carlisle campus) New Carlisle, St. Joseph County, IN | Not published | Not published | Per AWS, no cooling water used October–March, minimal use April–September ↗ |
| Project Thunderbird Enid, Garfield County, OK | Not published | Raw water from the Kaw Lake pipeline ↗ | closed-loop ↗ |
| Salem Township Innovation Campus Salem Township, Luzerne County, PA | Not published | Susquehanna River, via Talen Energy's existing infrastructure and withdrawal docket ↗ | Outside-air cooling most of the year; water-based cooling less than 2% of the year ↗ |
| Spring Valley Technology Park Loudoun County, VA | Not published | Not published | Air-cooling technology (applicant commitment) ↗ |
| White Oak Technology Park Appling, Columbia County, GA | 6,500,000 gal/day ↗ | Not published | Closed-loop cooling required under Data Center zoning district ↗ |
Figures are as stated by the cited source for each project; open a project for the source and any notes. “Not published” means no figure was found in the sources reviewed.